Skip to content

Design and Build · Visakhapatnam · Est. 2026

We draw the house, and then we build it.

One company for the drawing and the concrete, so there is nobody to send you back and forth between. Visakhapatnam, down the coast and inland, about twelve homes a year.

Watch it go up
The Long Verandah, Bheemili, the main space.

01 / 05 · Bheemili · Designed and built

The Long Verandah

Ninety feet of covered walk running the length of the house. Every room opens off it.

Grandmother's Terrazzo, Waltair Uplands, Visakhapatnam, the main space.

02 / 05 · Waltair Uplands, Visakhapatnam · Restored and fitted out

Grandmother's Terrazzo

We were hired to replace a 1954 terrazzo floor. We spent four months restoring it, then designed the rest of the house around it.

North Light, Rushikonda, Visakhapatnam, the main space.

03 / 05 · Rushikonda, Visakhapatnam · Designed and built

North Light

Four places to work, none of which look like a desk. All of them take north light.

Ground Plus One, Rajahmundry, the main space.

04 / 05 · Rajahmundry · Built to our drawings

Ground Plus One

Eleven people across three generations. The stair does most of the work.

First Flat, Madhurawada, Visakhapatnam, the main space.

05 / 05 · Madhurawada, Visakhapatnam · Interiors only

First Flat

Eight hundred and forty square feet, two adults, a toddler, and a budget that did not move.

The fear is cost and delay. Here is what we do about it.

24

Homes completed

6

Sites live right now

38

People on our own payroll

94%

Handed over within a month of the promised date

One company designs and builds it

So when the drawing and the wall disagree, there is nobody to send you back and forth between.

You pay per verified stage, never by calendar

Plinth, each slab, blockwork, first fix, plaster, handover. You release money when a stage is done and you have seen it.

Every price includes 18% GST

Quoting works contract without it is how a ₹2,900 rate quietly becomes ₹3,422 at the invoice. Ours does not.

We publish what is excluded, up front

Compound wall, driveway, borewell, approvals. The things other quotes leave out and add back at the end.

The contract carries a delay penalty

For delays we cause, at a rate agreed before you sign. We would rather you knew the number than found it missing.

Nothing is taken from suppliers

No commission from contractors, vendors or the stone yard. Our fee and our margin are the only money we make, and both are on the invoice.

Get an estimate

How a project runs

Six steps, in order. The first is half a day on site and the last is a year after you move in.

  1. 01

    Half a day on site, before anything

    On the land, or in the rooms, at two different hours. Most of what goes wrong in a house is a light problem, a level problem or a doorway problem, and none of the three show up on a plot plan.

  2. 02

    One proposal, not three

    Options are how a firm avoids having a view. You get a single considered scheme. We will argue for it, and change it if you make the better case.

  3. 03

    The full number, before ground is broken

    A line-item budget covering structure, services, finishes and interiors, with our margin shown as its own line rather than buried in the rates. If a number moves you hear it from us that week, not at handover.

  4. 04

    We build what we drew

    Our own site engineer, our own supervisors, our own joinery workshop. This is the reason we started building at all: when the drawing and the wall disagree, there is nobody left to blame and nobody to send you back and forth between.

  5. 05

    Photographs every week, whether or not you ask

    Dated, from the same positions, including the parts that are behind plaster now. Most disputes on a site are really arguments about what was there in March.

  6. 06

    Back at three months, and at a year

    Buildings settle, monsoons find things, and families change. What needs adjusting is rarely what anyone predicted.

Money, mostly

Questions we get asked.

Chat with us